|
|
Suitability evaluation and geological suggestions of the bridge construction sites along the middle reaches of Yangtze River |
ZHAO Xingyuezi1, PENG Ke1, XIAO Pan1, HE Jun1, CHENG Gang2, DENG Birong3 |
1. Wuhan Geological Survey Center, China Geological Survey, Wuhan 430205, China; 2. Hubei Geological Environment Station, Wuhan 430034, China; 3. Jiangxi Institute of Geological Survey, Nanchang 330000, China |
|
|
Abstract Based on the geological environmental conditions along the middle reaches of Yangtze River and the basic requirements of the bridge site construction, three evaluation factors—topography and landform, regional stability, and engineering geological conditions were chosen in this paper. The authors applied Analytic Hierarchy Process (AHP) to evaluate the construction suitability of the bridge site along the middle reaches of Yangtze River. Four grades as appropriate for development, relatively appropriate for development, generally appropriate for development, and non-priority development, were divided. The bridges in the middle reaches of Yangtze River are mainly areas suitable for development and generally suitable for development, with lengths of 625.19 km and 598.99 km respectively, which account for 31.35% and 30.04% of the total length of the bank line. According to the characteristics of each grade in the middle reaches of Yangtze River, corresponding geological suggestions were put forward. It is expected to provide geological guidance for optimizing the site selection of the bridge along the middle reaches of Yangtze River, and to promote the spatial planning of Yangtze River Economic Zone and the utilization and protection of the bank line.
|
Received: 19 April 2019
|
|
|
|
|
[1] 梁川,李慧娟,陈刚,等.基于层次分析法的过江隧道工程场地适宜性研究——以长江中游簰洲湾—武穴段为例[J].资源环境与工程,2017,31(6):758-763. [2] 吴琦. 《长江经济带发展规划纲要》正式印发[J].城市规划通讯,2016(18):6. [3] 梅芹芹,龚绪龙,史雅栋,等.江苏沿海地区工程建设地质适宜性评价[J].地质学刊,2018,42(2):317-322. [4] 刘建东,杨泉宁,薛怀友,等.地质环境质量评价的态势分析法[J].江苏地质,2006,30(1):17-20. [5] 全国主体功能区规划编制工作领导小组办公室.全国主体功能区规划(2008—2020年)[Z]. [6] 陈名,尹庆民,许长新.大丰港段岸线资源开发利用的经济评价研究[J].重庆理工大学学报:自然科学版,2016,30(4):132-136. [7] 郭金玉,张忠彬,孙庆云.层次分析法的研究与应用[J].中国安全科学学报,2008,18(5):148-153. [8] 吴晓云,吴萍.基于知识的层次分析法及其应用[J].南京理工大学学报,2005,29(4):451-454. [9] 程静静,胡善风,张圆刚,等.基于粗糙集和层次分析法的农村居民旅游目的地选择研究[J].地理科学,2016,36(12):1885-1893. [10] 许树柏. 层次分析法原理[M].天津:天津大学出版社,1988:51-59. [11] 朱建军. 层次分析法的若干问题研究及应用[D].沈阳:东北大学,2005. [12] 肖攀,喻望,胡光明,等.江汉—洞庭平原地下水功能评价与区划[J].人民长江,2017,48(1):6-11,19. [13] 杨澍,初禹,杨湘奎,等.层次分析法(AHP)在三江平原地质环境质量评价中的应用[J].地质通报,2005,24(5):485-490. [14] 刘锁旺,丁忠孝.湖北省地震志[M].北京:地震出版社,1990. [15] 赵平顺. 江西省地震志[M].北京:方志出版社,2003. |
[1] |
LIU Hongying, JIANG Yuehua, YANG Guoqiang, JIN Yang, YANG Hui, ZHOU Quanping. Characteristics of rock salt mines and suitability evaluation of salt cave storages in Yangtze River Economic Zone[J]. , 2019, 6(5): 89-98. |
[2] |
YU Cheng, GE Weiya, JIA Junyuan, XING Huaixue, LEI Ting, LI Liang. Regionalization and assessment of the geological hazard areas in South Jiangsu[J]. , 2019, 6(5): 131-136. |
[3] |
LIU Yue, TAN Jianmin, LI Yuanyao, LI Ming, XIE Jialong, LIU Zhuang. Suitability evaluation of port construction site in Three Gorges Reservoir based on hybrid units[J]. , 2019, 6(5): 107-114. |
[4] |
GUO Jian-qiang, WEN Dong-guang, ZHANG Sen-qi, XU Tian-fu, LI Xu-feng,DIAO Yu-jie, JIA Xiao-feng. Potential Evaluation and Demonstration Project of CO2 Geological Storage in China[J]. , 2015, 2(4): 36-46. |
|
|
|
|