Home   |   About Journal   |   Editorial Board   |   Youth Editorial Board    |   Instruction   |   Ethics Statement   |   Open Access   |   Contacts Us   |   中文
  2021, Vol. 8 Issue (2): 20-25    DOI: 10.19388/j.zgdzdc.2021.02.05
Current Issue | Archive | Adv Search |
Construction of the operation and maintenance model and guarantee system for comprehensive observation system of natural resource elements
LUO Qi1,2, HE Yinfeng3, WANG Peng4, ZHANG Xunxun1,2, DUAN Yanghai1,2, WEN Lang1,2
1. Applied Geological Survey Center, China Geological Survey, Sichuan Chengdu 610036, China;
2. Key Laboratory of Coupling Process and Effect of Natural Resources Elements, Beijing 100055, China;
3. Urumqi Natural Resources Comprehensive Survey Center, China Geological Survey, Xinjiang Urumqi 830000, China;
4. Xining Comprehensive Natural Resources Survey Center, China Geological Survey, Qinghai Xining 810000, China
Copyright © Editorial Board of
Supported by: Beijing Magtech